Manage Project Account Groups (PAGs) - Manage Project Account Groups (PAGs) - OnBase - REQConnect - OnBase/REQConnect/Foundation-25.1/REQConnect/Configuration-Costpoint-Settings-for-REQConnect/Manage-Project-Account-Groups-PAGs - Foundation 25.1 - Foundation 25.1

REQConnect

Platform
OnBase
Product
REQConnect
Release
Foundation 25.1
License
ft:lastPublication
2026-10-28T11:58:11.216933
ft:locale
en-US

The Manage Project Account Group setup screen in Costpoint affects which account values are available for selection in REQConnect.

  • Controls which GL accounts may be charged to a project.

  • Each account is created in the Manage Accounts screen and must have Project Required selected (see Manage Accounts).

  • Function Code: May be used to control the requirement of a labor charge when coding an invoice. If the function code is LABOR, then an IAConnect configuration setting can either require or not require a PLC code to be entered.

  • Active: An account may be set to inactive for a specific PAG and still be active for charging in other situations.